INDUSTRIAL FACTORY AND CAR PARK PROJECT, HERNANI. SPAIN.
• CONCRETE GRADE: C25
• THICKNESS 150 mm
• AREA 3,000 m2
• GROUND BEARING RATE: CBR 20 %
• FIBRATEC DOSAGE: 3 Kg /M3
• Steel Mesh 150/150/6mm replaced with Fibratec V12.
• MAX POINT LOAD: 3,000 kg
VALENCIA STATION, SPAIN.
• Grade C20 Concrete
• 2.5 kg per cubic metre of alkali-resistant glass fibres.
• Slab thickness 150mm
• Replacing steel mesh 150 x 150 x 5mm
Design considerations :
• Single wheel axles, span 1.7 metres.
• Max load evenly distributed 4800kg per m2
• Maximum point load 2150kg
BANCO BILBAO VIZCAYA, GRANOLLERS, SPAIN.
• CONCRETE GRADE: C25
• THICKNESS 200 mm
• AREA 3000 m2
• GROUND BEARING RATE: CBR 15 %
• FIBRATEC DOSAGE: 2 Kg /M3
• Steel Mesh 150/150/8mm replaced with Fibratec V12.
• MAX DYNAMIC LOAD: 7,150 Kg/axis
• MAX POINT LOAD: 4,100 kg
• DISTRIBUTED LOAD: 5,600 kg/m2
• JOINTS CUT EACH 5 x 5 metres in external slabs and 5.5 x 5.5 metres on internal slabs.
ENGINEERING FACTORY CAR PARK, BRISTOL. UK.
Engineering factory external hard-standing.
Cars and delivery truck use.
Approx 120 m2 area.
Ready mixed concrete using Volumetric Mixer.
Poured October 2012.
Concrete grade C25
2.0 kg per m3 Fibratec V12 Fibres.